Church Street Water Main Replacement

Hartford, Connecticut

 

BETA prepared construction plans and specifications to replace approximately 3,500 feet of water main on Church Street. The design was completed in two phases and called for a new 20” water main to replace an existing 100-year-old 16” main. The Phase I project stretched from Main Street to High Street and the Phase 2 portion from High Street to Myrtle Street.

Project Management Team