Pages
- About
- Careers
- Contact Us
- Cookie Policy
- GIS File Sharing
- Homepage
- Portfolio
- Privacy Policy
- Services
- Sitemap
- Solutions
- The Latest from BETA
Services
- Stormwater Management
- Planning
- Landscape Architecture & Urban Design
- GIS & Asset Management
- Environmental Science
- Environmental Permitting
- Construction Services
- Water & Wastewater Engineering
- Transportation & Traffic Engineering
- Structural Engineering
- Civil/Site Engineering
Solutions
- ADA Compliance Solutions
- Brownfields Redevelopment
- Multi-Use Trails & Active Mobility Networks
- Parks & Recreation Design
- Pavement Management
- Pump Stations
- Safe Streets For All
- Wayfinding Signage Design & Branding Solutions
Team Members
- Christopher McDermott, PE, LSP
- Kwesi Brown, PE, PTOE
- Thomas Carr, PE
- David Lane
- Laura Krause
- Christopher Turgeon, PE, ENV SP, LPA
- Jason Plourde, PE, PTP
- Nathan Socha, PLA, ASLA
- Jay Metzger
- Jared Linhares, PE, CPSWQ
- Ryan Greenway, PE
- Joseph Farley-Simmons
- Thomas LeCourt, PE
- Ryan Grew
- Susan Benoit
- Glenn Stevens, PE, PTOE
- Georgia Tentas, EIT
- Karen Leung, PE
- Christopher Roy, PE
- Danny Rebelo, PE
- Peter Natowich, PE
- Bryan Harpin
- Joshua Rainho, PE
- Isaac Almy, PE
- Jonathan Niro, PWS
- Tito Sanchez, GISP
- Benjamin Boynton, PE
- Matthew Alger, LSP
- Amanda Koukol, PHR
- Jason Ouimet, PE, LEED AP
- Jaklyn Centracchio, PE, PTOE, LEED Green Associate
- Peter Garvey, PE
- John Michalak, PE, ENV SP
- Matthew J. Crowley, PE
- Craig R. Ellis, LSP
- Robert E. Smith, LSP
- Todd Warzecki, PE
- Cheryl Souza
- Dennis Flynn, PE, PTOE
- Richard Stinson, PWLF
- John Byatt, PE
- Greg Snow
- Roger Thibault, PE, LSP
- Daniel McCormack, PE
- Nicole Iannuzzi, PE
- Matthew Shute, PE
- Jeffrey Maxtutis, AICP
- Beth Scanlon
- Andrew J. Dennehy, PE
- Nicholas J. Corvello, PE
- Christopher W. Jones, PE
- John L. Bertoli, LEED AP
- Najib O. Habesch
- Merrick Turner, PE
- Darshan N. Jhaveri, PE
- Mark R. Gershman, PE
- Robert T. Mackie, PE, BCEE
- Kien Y. Ho, PE, PTOE
- Joseph R. McLoughlin, II, LSP, LEP
- Arek W. Galle, PLA, AICP
- Steven J. Richtarik, PE
- Christopher R. Cronin, PE
- William P. McGrath, PE
- Randall L. Collins, Jr., PLA, ASLA
- Kevin M. Aguiar, PE
- Anthony J. Garro
- Joseph Federico, PE
- Michael E. Grilli, PE
Projects
- Reilly School Playground
- Bruce Freeman Rail Trail
- Whittier Bridge - Garrison Trail Interpretive Signage
- Castle Island Playground Renovation
- Shade Tree Inventory and Management Plan
- Port of Galilee Signage
- Local Heritage Interpretive Signage
- Wayfinding Signage Master Plan
- Wayfinding and Signage Implementation
- MassCoastal Permitting and Environmental Monitoring
- Veterans Memorial Park
- Urban Forest Equity Planning
- Traffic Signal Inventory
- Taxiway C Realignment & Rehabilitation at T.F. Green Intl. Airport
- MBTA PTC/ATC Program
- Winsor Park Recreation Master Plan
- Peer Review Services
- Shaker Boulevard over the Knox River Engineering Study
- Dunn's Corner Elementary School
- Derry Fire Station
- Safe Streets for All Action Implementation
- Safe Streets for All (SS4A) Action Plans
- Wellesley Square Improvements Preliminary Design Phase
- Barrett Park Master Improvements Plan
- Souhegan River Pedestrian Trail
- Route 44 Reconstruction - Environmental Permitting
- On-Call Road Rehabilitation
- Reconstruction of Route 20
- Wastewater Facilities Plan Amendment - Nasonville Village
- Wastewater Projects
- MBTA Environmental Engineering Services
- Pavement Management Program
- Route 5 (Greenwich Avenue) over Pawtuxet River
- Carroll Plaza Reimagination
- Main Street Crosswalk and Sidewalk Safety Improvements
- Broadway (Route 138) Roadway and Traffic Signal Improvements
- Hampton Circle Playground Flood Recovery and ADA Improvements
- LSP Services at Former Saint-Gobain Manufacturing Site
- Needham Town Common
- Brownfields Assessment and Remediation
- Sandwich-Barnstable-Yarmouth Route 6 Widening Project
- Phase III CSO Program - Contracts IIIA-4 and IIIA-5
- Wastewater Treatment and Nutrient Removal Facilities
- Pump Stations Hazardous Building Materials Mitigation
- Taunton Wastewater Treatment Facility Upgrade
- Master Planning
- Peterson Puritan Superfund Site OU2
- Kenneth F. Burns Memorial Bridge Panels & Plaques
- Connecticut Riverwalk North
- Samuel Bolden Park Relocation
- Complete Streets Prioritization Plan
- Bicycle & Pedestrian Plan
- Pedestrian Facilities Inventory and Accessibility Review
- Smithfield Dog Park
- Wire Road Intersection Improvements
- Traffic Signal System Improvements
- GIS & Asset Management Services
- Farmland Master Plan
- Beavertail State Park Master Plan
- Hazard Mitigation Plan Update
- Parks Master Plan
- Traffic Sign Inventory & Capital Improvement Program
- Main Street Reconstruction
- Valley Street Complete Streets Improvements
- Lakeport Square Intersection Improvements
- Washington Street Signal System Optimization
- Northern Rail Trail
- Asset Management Program
- Pavement Management Program
- Union Avenue Improvements
- Wayfinding and Signage Plan
- Wayfinding and Signage Plan
- NH Route 125 Improvements
- Union Avenue Roadway Improvements
- Route 6 Improvements
- Victory Highway (Route 102) over I-95 Bridge Replacement
- Route 21 (Center Street) Corridor Improvements
- Main Street (Route 117) and Wattaquadock Hill Road
- Local Rapid Recovery Plans
- Park Terrace Roundabout Design
- Town-wide Transportation Study
- Washington Highway Pumping Station & Force Main Replacement
- Main Street CBD Traffic & Corridor Improvements
- Garrahy Parking Garage at RICCA
- Brownfields Investigations
- Design and Permitting for Parker's River Landing Park and Boardwalk
- East Bay Sliplining Emergency Response
- LSP/Environmental Assessment & Remediation Services
- Boston Road & Allen Road Intersection Improvements
- Union Avenue Utility Improvements
- Water Treatment Plant Upgrade
- Benton Hill Road Culvert Replacement and Ecological Services
- Slater Mill Multi-Use Path Improvements
- Route 16 over MBTA/Rivers Edge Drive Bridge Replacement
- Washington Street (Route 138) Improvements
- Route 140 & Maple Street Intersection Improvements
- Blackstone River Bridge Replacement
- Sea Street Corridor Improvements
- Graf Road Pump Station Replacement
- Main Street Corridor Improvements
- Paul Revere Park Playground
- Spencer Street Improvements
- Broadway Streetscape
- McKnight Community Trail
- Norton/Mansfield Rail Trail Extension
- Cochituate Rail Trail
- I-95 over Toll Gate Road & Centerville Road Bridges Superstructure Replacement
- Route 1 Bridge over Noroton River Replacement
- Municipal Vulnerability Preparedness Planning
- Utility Infrastructure Asset Management Program
- Main Lift Pumping Station
- Mohawk Bicycle Trail Environmental Services
- PFAS Remediation Services
- Atlantic Avenue over Little Harbor Inlet Bridge Replacement
- I-95 over Tefft Hill Trail Bridges Replacement
- MCP Services & LSP Oversight
- Shrewsbury Street Roadway Improvements
- New Interchange at I-295 and Greenville Avenue
- Amity Path (Accessible Reservoir Trail)
- Water System Master Plan
- Washington Pedestrian Bridge/George Redman Linear Park
- Downtown Design & Construction
- Walnut Hill Park Drainage Improvements
- Sharon Road over Mad River - Bridge Rehabilitation
- Norwood High School - Campus Development
- ADA Sidewalk Compliance
- Tidewater Master Planning
- Mago Point Redevelopment
- Urban Corridor Feasibility & Transportation Improvements
- Central Avenue / Elliot Street Bridge Rehabilitation
- Veterans Memorial Park Master Plan
- North Square
- Goodale Park Master Plan
- South Street Landing
- Commonwealth Avenue Improvements (CAP 2A) Complete Streets
- Advanced Wastewater Treatment Facility Upgrade
- Dean Street Pumping Station
- Salisbury Beach Water Storage Tank Replacement
- St. Mary Street Pump Station Replacement
- Belmont Street (Route 9) Improvements
- Traffic Signal Improvements
- Route 5 Corridor Improvements
- Stillwater Road Corridor Improvements
- Reconstruction of Route 138
- Downtown Streetscape and Traffic Improvements
- PPAC Roadway and Streetscape Improvements
- Water Street Improvements
- North Easton Village, Main Street Redevelopment
- Route 27 Improvements
- Historic Lexington Town Center and Battle Green
- Minor League AA Baseball Stadium, Downtown North Development Project
- Bushnell Park North - Complete Streets
- Colrain Road Roundabout
- Dedham Square Traffic, Roadway, and Streetscape Improvements
- Allen Road Corridor Improvements
- Town Wide Traffic Signal Inventory and Assessment
- Washington Street Bridge Replacement
- Bay Street Bridge Replacement
- Accelerated Bridge Program
- Central Street Bridge Design
- CSX Design-Build Bridge Bundle
- East and West Park
- Portuguese Discovery Monument
- Chapel and May Street Water Main Replacement & Streetscape Improvements
- NBC Sewer Separation / Flow Modification
- Pleasant Street Transmission Main Installation
- Pleasant Street Water Pumping Station Improvements
- Goodnow Water Storage Tank Rehabilitation
- Lower Beacon Street Sewer Separation
- Wastewater Treatment Plant Improvements
- Wickford Junction MBTA Station
- PCB Investigation, Remediation, & Visioning for City Pier
- Former Uniroyal Facemate Facility Brownfields Redevelopment
- Beaver Brook Culvert and Park Improvements
- Tanyard Brook Watershed Study and Design
- Fuller Brook Park Preservation
- Hospital Road Bridge over the Nashua River